Wednesday 22 October 2014

Our frame was completed today & the roof trusses installed. Looking good!!!
Windows have been delivered and should be soon installed.






After the slab had a chance to cure, the site was handed back to us to build a retaining wall. Eventually the wall will run the full length down the side of the house but because of lack of room, the area where the water tanks are to be installed had to be completed before the build could progress.


`