Friday 16 January 2015


At lockout stage!!!!

  Or so we thought, found the back door was unlocked so we got to have one last look around.
  Preparation for the wet area screeding has been done and tiling should commence next week. Kitchen & laundry cupboards have been delivered, Watertank in place and everything going to plan 










                   Bedroom no. 2


Main Bedroom



              Ensuite  ready
          for screeding    before tiling



Theatre room-   65 inch in storage to fill that hole

                                                                                     

                                                                                          Main bathroom










                                                                         Kitchen ready to be installed










     Laundry sink cupboard

       


                          Love our front door


Saturday 10 January 2015



 Kitchen, Living room


                                                                                               Theatre room





Main bedroom