Saturday 21 February 2015



Disappointed to see the damage to my kitchen cabinets during transport / fitting. I presumed they would be replaced before the 60mm Benchtop was fitted, but no.There are chips on both end panels and 2 or 3 draws.
Expecting a call to book PCI  next week.

We are happy with 98% of the build and realize there are 'issues' with every build, no matter who it is with.
We hope they will be addressed before handover.
    

     











Friday 20 February 2015


Getting close now, just waiting for the call from the SS to arrange Practical Completion Inspection
Already noticed some problems with some major chips in Kitchen Island bench end panels






                                           



                                               Video doorbell monitor - Thought it would be bigger



Friday 13 February 2015





Kitchen benchtops installed

They have a protective covering on them 







               Ensuite installed





Main bedroom





Friday 6 February 2015



Kitchen cabinets installed & wet area tiling completed
Painting started yesterday & there was an airconditioning van outside the house