At lockout stage!!!!
Or so we thought, found the back door was unlocked so we got to have one last look around.
Preparation for the wet area screeding has been done and tiling should commence next week. Kitchen & laundry cupboards have been delivered, Watertank in place and everything going to plan
Bedroom no. 2
Main Bedroom
Ensuite ready
for screeding before tiling
Theatre room- 65 inch in storage to fill that hole
Main bathroom
Kitchen ready to be installed
Laundry sink cupboard
Love our front door