Electrical rough in, Ducted vac, alarm & front woodwork installed
Saturday, 6 December 2014
Friday, 21 November 2014
Friday, 7 November 2014
Wednesday, 22 October 2014
Friday, 26 September 2014
Pleasantly surprised to find the piering completed on Monday. We had an allowance of 70 lineal metres but it only came in at 38, so that will be a big saving. The slab preparation and waffle pods was completed on Thursday and the Slab poured today ( Saturday ).
When the slab has set the site will be handed back to us to the address some retaining wall issues which I an not looking forward to. Oh well, knew it would have to be done sometime!!!
Storm water pipes
When the slab has set the site will be handed back to us to the address some retaining wall issues which I an not looking forward to. Oh well, knew it would have to be done sometime!!!
Storm water pipes
Friday, 19 September 2014
Drove past the block yesterday on my way home from work, and to my surprise the site had been cut and leveled. WOW!!! what a difference it makes being able to see how the house will sit after all these months.
I got a call form our slab supervisor who said they had hit rock ( which we had expected ), But the variation only came in at $1584.00, So we were pretty happy with that. He said they will be starting the piering on Monday so hopefully that will go well too.
The rock they hit is all sandstone which we plan to use around the yard ( when we get time)
I got a call form our slab supervisor who said they had hit rock ( which we had expected ), But the variation only came in at $1584.00, So we were pretty happy with that. He said they will be starting the piering on Monday so hopefully that will go well too.
The rock they hit is all sandstone which we plan to use around the yard ( when we get time)
Tuesday, 1 July 2014
CONTRACT SIGNED!!!
Had second thoughts about the tiles we picked for the wet areas.
We made another appointment and are much happier with the results.
Had to pay a fee for the change and a lot more to upgrade to porcelain
but feeling better that we did.
Had garage widened 960mm, Extended Pantry
And front bedroom (bed 2) modified to fit bigger linen cupboard